Are You Still Buying Cooling Towers as per TR Capacity?
Are You Still Buying Cooling Towers as per TR Capacity?
Why TR Became the Default Way to Ask for a Cooling Tower
Where TR Works: Air-Conditioning and Refrigeration Applications
Why TR Fails for Industrial Process Cooling
1. The tower falls short
2. The tower is oversized
Heat Rejection Capacity Alone Is Also Incomplete
Approach: The Parameter That Decides Cooling Tower Size
| Plant A | Plant B | |
|---|---|---|
| Water flow | 100 m³/h | 100 m³/h |
| Hot / cold water temperature | 36°C / 31°C | 38°C / 33°C |
| Range | 5°C | 5°C |
| Wet bulb temperature | 27°C | 27°C |
| Approach | 4°C | 6°C |
| Heat rejection | 5,00,000 kcal/h | 5,00,000 kcal/h |
| Tower size | Larger | Smaller |
Buying by TR vs Buying by Process Data: Advantages and Disadvantages
Buying by TR
Advantages
- Simple to ask for. One number is enough to start an enquiry.
- Familiar to everyone, from consultants to suppliers.
- Suitable for air-conditioning and refrigeration duty, where the machine itself is rated in TR.
Disadvantages
- The design conditions behind the TR figure are hidden, so you do not know the approach, range or wet bulb temperature the supplier assumed.
- For process cooling, it can give lower efficiency: either a small temperature drop that increases wear and tear on the machine, or higher fan motor and pump power.
- Quotes from different suppliers cannot be compared fairly, because the same TR can mean towers of different sizes.
Buying by Process Data
Advantages
- The tower is designed for your machine’s actual hot and cold water temperatures.
- Fan and pump power are matched to the duty, so running costs are lower and the investment pays back as intended.
- Quotes are comparable because every supplier works from the same stated conditions.
Disadvantages
- You need to collect six data points before asking for a quote.
- It takes a little more time at the enquiry stage, and your process or utilities team may need to supply the figures.
- A low approach requirement increases tower size and cost, so the real price of a tight temperature becomes visible. This is a benefit for your decision, but it can feel like a disadvantage at first.
What Wet Point’s Expert Suggest
The 6 Data Points to Give Your Supplier Instead of TR
Water flow rate
Hot water temperature
Cold water temperature
Wet bulb temperature
Water quality
Space constraints
How to Check a Supplier’s Quote Against These Parameters
- Does it state the hot water, cold water and wet bulb design temperatures, not just a TR figure?
- Does it state the water flow rate in m³/h?
- Does it list the fan motor and pump power, so running costs can be compared?
- Is the stated approach realistic for the wet bulb temperature of your site?
- Does it state the fill area and tower size?
FAQs
Only for air-conditioning and refrigeration applications. For industrial process cooling, no. Specify the water flow, hot and cold water temperatures and wet bulb temperature instead.
TR is a rating unit that comes from air-conditioning and refrigeration. Heat rejection is the actual heat removed from the water, calculated from flow and range. Approach is the cold water temperature minus the wet bulb temperature, and it decides how large the tower must be.
Water flow rate, hot water temperature, required cold water temperature, wet bulb temperature of the site, water quality and any space constraints.
Each supplier assumes different design conditions behind the TR number, such as a different approach, range or wet bulb temperature. Towers of different sizes then carry the same TR label. Ask every supplier to quote on identical stated conditions.
Get a Quote Based on Your Process Data